![McMinnville Honda](https://www.carlsonveit.com/wp-content/uploads/2019/02/MC-Honda_1med899x600.jpg)
![McMinnville Honda](https://www.carlsonveit.com/wp-content/uploads/2019/02/MC-Honda_2med.jpg)
![McMinnville Honda](https://www.carlsonveit.com/wp-content/uploads/2019/02/MC-Honda_3med.jpg)
![McMinnville Honda](https://www.carlsonveit.com/wp-content/uploads/2019/02/MC-Honda_4med.jpg)
![McMinnville Honda](https://www.carlsonveit.com/wp-content/uploads/2019/02/MC-Honda_5med.jpg)
McMinnville Honda
Completed in 2017, this project comprised a remodel of an existing 4,800 SF service shop and the addition of an 11,300 SF two-story showroom and employee area. Because the site lacked connections to the city utilities, a 25,000-gallon tank was used to supply the fire sprinkler water to the building, while a new septic drainfield was strategically located to maximize the amount of parking available on the site. The building addition utilized CMU bearing walls and steel framing to create a modern facility, perfect for the team at McMinnville Honda.
Location: McMinnville, Oregon