McMinnville Honda

Completed in 2017, this project comprised a remodel of an existing 4,800 SF service shop and the addition of an 11,300 SF two-story showroom and employee area. Because the site lacked connections to the city utilities, a 25,000-gallon tank was used to supply the fire sprinkler water to the building, while a new septic drainfield was strategically located to maximize the amount of parking available on the site. The building addition utilized CMU bearing walls and steel framing to create a modern facility, perfect for the team at McMinnville Honda.

Location: McMinnville, Oregon